Home
Floating technology
Wind farm costs
Detailed guide
This Guide
Assumptions used in this Guide
Development and project management
Wind Turbine
Balance of plant
Installation and commissioning
Operations and maintenance
Decommissioning
Procurement structures
Supply chain
UK market
UK content
Glossary
More information
Contact
About this guide
Development &
project management
P.4.2.1 Geotechnical survey vessel
P.2.1.1 Ornithological and mammal surveying
P.4.1 Geophysical survey
P.4.2 Geotechnical survey
P.3 Resource and metocean assessment
P.4.1.1 Geophysical survey vessel
P.6 Project management
B.4.5 Foundation
Manufacturing
B.2 Floating substructure
B.3.1 Anchors
B.3.2 Mooring lines
B.4 Offshore substation
B.2.1 Primary structure
B.1 Cables
Turbine assembly
I.5.1 Heavy lifting and moving equipment
T Turbine
T.1 Nacelle
I.8 Construction port
I.7 Inbound transport
I.5 Floating offshore wind turbine assembly
T.2 Rotor
T.3 Tower
Pre-installation
I.4.1 Anchor-handling vessel
I.2.3 Cable-laying vessel
I.1 Offshore substation installation
I.1.1 Substation installation vessel
I.2 Offshore cable installation
I.4 Anchor pre-installation
Floating offshore
wind turbine installation
I.6.1 Tow-out
I.6.2 Mooring line hook-up
I.6.3 Array cable hook-up
Operations & maintenance
(offshore)
O.3.1 In-situ repair
O.2.2.1 Monitoring, inspection and repair
O.2.1.2 Unmanned aerial vehicle
O.2.2.2 Anchors and mooring system inspection and minor repair
Operations & maintenance
(port)
O.4.2 Service operation vessels
O.3.2 Tow-to-port
O.4.1 Crew transfer vessels
O.5 O&M port
Decommissioning
D.1 Turbine decommissioning
D.3 Cable decommissioning
D.2 Anchor decommissioning
D.4 Offshore substation decommissioning
Sorry – this guide requires a larger screen size. Please visit this page on a laptop or desktop computer, on a full page.
Guide to a Floating Offshore Wind Farm
Lifecycle overview
Floating technology
Fixed versus floating
Technical detail
3
Introduction
3
1.1. This guide
1.2 Assumptions used in this guide
Development and project management
3
P Development and project management
P.1 Development and consenting services
P.1.1 Environmental impact assessments
P.2 Environmental surveys
P.2.1 Offshore species and habitat surveys
P.2.1.1 Offshore ornithological and mammal surveying vessels and craft
P.2.2 Onshore environmental surveys
P.2.3 Human impact studies
P.3 Resource and metocean assessment
P.4 Geological and hydrographical surveys
P.4.1 Geophysical surveys
P.4.1.1 Geophysical survey vessels
P.4.2 Geotechnical surveys
P.4.2.1 Geotechnical survey vessels
P.4.3 Hydrographic surveys
P.5 Engineering and consultancy
P.6 Project management
Wind turbine
3
T Wind Turbine
T.1 Nacelle
T.2 Rotor
T.3 Tower
T.4 Electrical system
Balance of plant
3
B Balance of plant
B.1 Cables
B.1.1 Array cable
B.1.1.1 Array cable core
B.1.1.2 Array cable outer
B.1.2 Export cable
B.1.2.1 Export cable core
B.1.2.2 Export cable outer
B.1.3 Cable accessories
B.1.3.1 Interface
B.1.3.2 Cable protection
B.1.3.3 Buoyancy
B.1.3.4 Connectors and joints
B.2 Floating substructure
B.2.1 Primary structure
B.2.2 Secondary steel
B.2.3 Substructure auxiliary systems
B.2.4 Corrosion protection
B.3 Mooring system
B.3.1 Anchors
B.3.2 Mooring lines
B.3.3 Jewellery
B.3.4 Topside connections
B.4 Offshore substation
B.4.1 HVAC electrical system
B.4.2 HVDC electrical system
B.4.3 Auxiliary systems
B.4.4 Topside structure
B.4.5 Foundation
B.5 Onshore substation
B.5.1 Electrical system
B.5.2 Buildings, access, and security
Installation and commissioning
3
I Installation and commissioning
I.1 Offshore substation installation
I.1.1 Substation installation vessel
I.2 Offshore cable installation
I.2.1 Export cable installation
I.2.2 Array cable installation
I.2.3 Cable-laying vessel
I.2.4 Cable-laying equipment
I.2.5 Cable pull-in
I.2.6 Electrical testing and termination
I.3 Onshore export cable installation
I.4 Anchor and mooring pre-installation
I.4.1 Anchor-handling vessel
I.4.2 Installation equipment
I.5 Floating offshore wind turbine assembly
I.5.1 Heavy lifting and moving equipment
I.5.2 Technician services
I.6 Floating offshore wind turbine installation
I.6.1 Tow-out
I.6.2 Mooring line hook-up
I.6.3 Array cable hook-up
I.6.4 Final commissioning
I.7 Inbound transport
I.8 Construction port
I.9 Offshore logistics
I.9.1 Sea-based support
I.9.2 Marine coordination
I.9.3 Weather forecasting and metocean data
I.9.4 Marine safety and rescue
Operations and maintenance
3
O Operations and maintenance
O.1 Operations
O.1.1 Operations control centre
O.1.2 Training
O.1.3 Onshore logistics
O.2 Maintenance
O.2.1 Turbine maintenance
O.2.1.1 Blade inspection and minor repair
O.2.1.2 Unmanned aerial vehicle
O.2.2 Balance of plant maintenance
O.2.2.1 Floating substructure monitoring, inspection and minor repair
O.2.2.2 Anchors and mooring system inspection and minor repair
O.2.2.2.1 Remotely operated vehicle
O.2.2.2.2 Autonomous underwater vehicle
O.2.2.3 Cable monitoring, inspection and minor repair
O.2.2.4 Scour monitoring and management
O.2.2.5 Substation monitoring and maintenance
O.2.3 Statutory inspections
O.2.3.1 Health and safety equipment
O.3 Major repair
O.3.1 Main component refurbishment, replacement, and repair (in-situ)
O.3.2 Main component refurbishment, replacement, and repair (tow-to-port)
O.4 Offshore vessels and logistics
O.4.1 Crew transfer vessels
O.4.2 Service operation vessels
O.4.3 Turbine access systems
O.4.4 Helicopters
O.5 O&M port
Decommissioning
3
D Decommissioning
D.1 Floating offshore wind turbine decommissioning
D.2 Anchor and mooring system decommissioning
D.3 Cable decommissioning
D.4 Offshore substation decommissioning
D.5 Decommissioning port
D.6 Reuse, recycling, or disposal
Wind farm costs
Procurement structures
Supply chain
UK market
UK content
Glossary
More information
Contact
About this guide
Download a PDF version of the guide
CLOSE
MENU